History
Past
1984
• First fax machine, Roofers could send fabrication drawings
Read more1985
• Switched from handwritten ledgers to one computer
Read more1987
• Bought first Toyota flatbed truck, put hand brake on back for field fabrication
Read more1992
• Purchased Tool Crib/Seatrain (still use it today)
Read more1995
• Purchased 10 ft shear and auto brake (first automated equipment)
Read more1997
• Upgraded the accounting software to Business Works
Read more1998

• Relocated to H Street in Fresno, CA
• Built 40 ft gutter transport trailer
• Purchased 20 ft 200-ton press brake

Present
2001
• Purchased first Roll Former
• Purchased first Freightliner
2002
• Purchased duct plasma table
Read more2003
• Built 65’ gutter transporter trailer
Read more2004
• Four C’s was incorporated
• Remodeled H street and moved warehouse to the brick building next door
• Helped build the Palace Indian Gaming Center in Lemoore
2005

• AMW became incorporated
• Purchased first coil line
• Purchased 20 ft XXL RAS
• Purchased 15,000lbs forklift
• Purchased roof panel roll former
2006
• Helped build Sanger Elementary and Harvest Elementary (Central Unified)
• Purchased soffit panel roll former
• Moved parts warehouse from the brick building to across the street where it is now
2007
• Company picnic at Central High Pool
• Helped build Portal Sierra One (Alluvial & Temperance)
• Helped build Fresno Juvenile Court Building
2008
• First major Metal wall panel job at Minarets High School
• Purchased first rotary laser
• Opened DAC Service (HVAC service company)
2009
• Helped build CSUF Science bldg. (Fresno State)
• Clovis Wastewater Treatment Plant
2010

• First major composite wall panel job
• Started our quarterly company-wide meetings
• Started our Company newsletter
• Bought out another sheet metal company to grow our business

Future
2011
• Completed a job in Idaho at the National Laboratory
Read more2013
• Attended Dave Ramsey’s Master Series
• Helped build the DMV on Olive
• Helped build 4 Les Schwab Tire stores in Fresno
2014
• Company picnic moved to Wonder Valley
• After paying off our last vehicle loan, all trucks are purchased with cash now
Read more
2015

• AMW helped refinish the Golden Gate Bridge
• Attended Dave Ramsey’s EntreLeadership Summit
• Finished the Madera Courthouse
• First company camping trip to Wishon
• Purchased Foundation software
2016
• Purchased 27’ Autobrake from Australia
• Completed the Wonderful Academy in Delano
2017
• Remodeled back office and moved into a larger conference room
• Hosted Active Shooting Safety Training in the office
• Purchased first utility truck
2018

• Awarded largest project in company history: Matilda Torres High School
• Purchased reach forklift
• Completed large round copper roof at Bishop Ranch
• Graydon Cross & his family moved to Montana
2019

• Purchased first ACM cutting table (CNC)
• Purchased full laser for ACM measuring
• Purchased Fully automated coil line
2020
• While adapting our safety practices throughout the COVID-19 pandemic, we are proud to have kept our team members working and the business growing!
Read more